    The furniture can wait. Here is the sequence for moving IT so the office is working on Monday morning.

    6 min readBy Gati Packers And Movers

    IT is the part of an office move where a mistake is expensive out of all proportion to the value of the hardware. A ₹40,000 workstation is replaceable; a day of forty people unable to work is not.

    Before anything is unplugged

    1. Back up, then verify the restore. An untested backup is a hope, not a backup. Restore a sample to a different machine and confirm it opens.
    2. Photograph the back of every machine and rack. Every cable, every port. Ten minutes of photography saves hours of guessing.
    3. Label both ends of every cable. Not just the machine end.
    4. Record asset tags, serial numbers and current locations against the new seating plan.
    5. Confirm power and network are live at the new office. Not "will be" — actually tested.

    Packing

    • Monitors: foam sheet against the screen, then bubble wrap, then a double-wall carton. Transported upright, screen outward, never flat with weight on it.
    • Desktops: original boxes if you have them. Otherwise foam-cushioned cartons, upright. Remove any expansion cards that are heavy or loosely seated.
    • Servers: rails removed, packed individually in anti-static wrap and foam, upright. Rack-mounted equipment should not travel installed in the rack unless the rack is designed for transport.
    • Drives and storage: anti-static bags, individually cushioned, and carried personally rather than trucked wherever practical.
    • Network equipment: switches and routers packed with their configuration backed up separately. A switch is easy to replace; its configuration is not.
    • UPS units: heavy and awkward. Batteries should be disconnected for transport.

    The reinstallation sequence

    Order matters more than speed:

    1. Network infrastructure first — switches, routers, access points, and confirm connectivity
    2. Servers next, powered on and verified before anything else depends on them
    3. Printers and shared devices
    4. Workstations, in seating-plan order
    5. Test workstation by workstation, not by a general announcement that "IT is up"

    Installing workstations before the network is live means testing everything twice.

    Condensation, the risk people forget

    Equipment moved from an air-conditioned office into a humid truck and back can condense internally. Let hardware acclimatise for two to four hours at the new location before powering on. In a Dehradun monsoon, this is not optional.

    Data security during the move

    • Encrypt drives before they travel
    • Move any equipment holding sensitive data in a separate, tracked, sealed container
    • Keep a signed chain of custody for anything holding customer or financial data
    • Wipe and document the disposal of anything not making the journey

    Monday morning

    Have IT support physically present for the first half day and expect a queue of small problems. Even a well-run move produces them; having someone on the floor turns each into five minutes instead of a ticket nobody logs.